Proposed Rule

Air Plan Approval; Commonwealth of Virginia; Transfer of Authority and Requests for Certain Public Hearings on Air Permits

Published 12 Aug 2026 · retrieved 14 Aug 2026, 02:30 EDT · version 1Official source

The full text was pulled automatically from the official source and is not Threadline News reporting; the annotations alongside it are.

Preamble

1

ENVIRONMENTAL PROTECTION AGENCY

2

40 CFR Part 52

3

Air Plan Approval; Commonwealth of Virginia; Transfer of Authority and Requests for Certain Public Hearings on Air Permits

Agency

1

Environmental Protection Agency (EPA).

Action

1

Proposed rule.

Summary

1

The Environmental Protection Agency (EPA) is proposing to approve a state implementation plan (SIP) revision request submitted by Virginia Department of Environmental Quality (VADEQ) on behalf of the Commonwealth of Virginia. The SIP revisions intend to make some sections of Virginia regulation Revision D22 that became effective on November 23, 2022 federally enforceable. The revisions limit the authority of the Virginia State Air Pollution Control Board (Board) to the issuance of regulations, and transfer the board's existing authority to issue permits, orders, and variances to VADEQ. Additionally, the revisions establish procedures for public comment on pending controversial permits and regulatory changes, and amend certain other procedural requirements related to VADEQ's issuance of permits. This action is being taken under the Clean Air Act (CAA).

Dates

1

Written comments must be received on or before September 14, 2026.

Addresses

1

Submit your comments, identified by Docket ID No. EPA-R03- OAR- 2026-2379 at www.regulations.gov, or via email to [email protected]. For comments submitted at Regulations.gov, follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from Regulations.gov. For either manner of submission, the EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be confidential business information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission (i.e., on the web, cloud, or other file sharing system). For additional submission methods, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section. For the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit www.epa.gov/dockets/commenting-epa-dockets.

For further information contact

1

Gwendolyn Supplee, Permits Branch (3AD10), Air & Radiation Division, U.S. Environmental Protection Agency, Region III, 1600 John F. Kennedy Boulevard, Philadelphia, Pennsylvania 19103. The telephone number is (215) 814-2763. Ms. Supplee can also be reached via electronic mail at [email protected].

Supplementary information

1

On July 1, 2025, VADEQ submitted a revision to Virginia SIP to limit the authority of the Board to issuances of regulations, and transfer the Board's existing authority to issue permits, orders, and variances to VADEQ. Virginia has also requested the EPA to approve the following parts of Virginia Administrative Code (VAC) 9VAC5-80-1255 and 9 VAC5-80-1773 as part of the Virginia SIP. The revision amended procedures for public comments on pending controversial permits. The revision has further defined the "Board" in section 9VAC5-10-20 and has changed "the Board" to "the Department" throughout State regulations codified in 9VAC5 chapters 10, 80, 85, and 170. The revision also made a few administrative changes on cross references in some sections.

I. Background

1

Section 110(a)(2)(C) of the CAA requires SIPs to have a preconstruction permit program for both major and minor sources. Virginia has a SIP approved state operating permit program (Article 5, State Operating Permit), a minor NSR permit program (Article 6. Permits for New and Modified Stationary Sources), a prevention of significant deterioration (PSD) permit program (Article 8 Permits--Major Stationary Sources and Major Modifications Located in Prevention of Significant Deterioration Areas), and a Nonattainment area New

2

Source Review (NNSR) permit program (Article 9 Permits--Major Stationary Sources and Major Modifications Located in Nonattainment Areas or the Ozone Transport Region). These permit programs were codified at 9VAC 5-80 to regulate certain modifications and construction of stationary sources in Virginia. The EPA approved these permit programs into Virginia's SIP to assure the national ambient air quality standards (NAAQS) are achieved and maintained in Virginia. See June 27, 2003, (68 FR 38191); August 22, 2016, (81 FR 56508); August 28, 2017, (82 FR 40703). VADEQ first submitted SIP Revision D22 to the EPA on July 10, 2023. However, the EPA's review observed discrepancies in the VA Code between the initial Revision D22 submittal and what had been previously approved by the EPA into the Virginia SIP. This was likely caused by the fact that Virginia had made several State regulatory amendments to its prior SIP-approved permits program regulations and some of those changes had not yet been approved by the EPA into the Virginia SIP. Subsequently, VADEQ withdrew the original Revision D22 submittal on December 10, 2024. A copy of the letter has been included in the docket for this action. After reconciling the discrepancies between Virginia State regulation Revisions G08 and D22 and the EPA approved SIP, VADEQ resubmitted Revision D22 to the EPA for approval into the Virgina SIP on July 1, 2025. The Virigina regulation Revision D22 was published in the Virginia Register of Regulations on October 24, 2022 and became effective on November 23, 2022.

A. SIP Revisions

1

The VADEQ submitted a Virginia SIP revision request to limit the authority of the Board to issuance of regulations, and to transfer the Board's existing authority to issue permits, orders, and variances to VADEQ. The revision made numerous changes from "the board" to "the department" throughout State regulations codified in 9VAC5 Chapter 10, Chapter 80, Chapter 85, and Chapter 170 in order to effectuate the transfer of authority. Additionally, the revisions establish the procedures for public comments on pending controversial permits and regulatory changes. Other substantive changes in this revision mainly involve sections related to action on permits and public participation for different permit programs. These include sections in Article 5 permits (State operating permits, section 9VAC5-80-860), Article 6 Permits (minor NSR permit, section 9VAC5-80-1160), Article 8 permits (Major Stationary sources and major modifications located in prevention of significant deterioration areas, sections 9VAC-80-1773 and 9VAC-80- 1775), Article 9 permits (Major Stationary sources and major modifications located in nonattainment areas or the Ozone transport region, sections 9VAC5-80-2060 and 9VAC5-80-2070). The revision also removed section 9VAC5-80-1040 (Review and Evaluation of Article) from the SIP as it was repealed in State regulations; it contained outdated requirements that expired in 2001. In addition, VADEQ's July 1, 2025 submittal has requested to add sections 9VAC5-80-1255 and 9VAC5-80-1773 to the Virginia SIP. Section 9VAC5-80-1255 (Actions to Combine Permit Terms and Conditions) was submitted as part of Virginia State regulations Revision H05, which was approved by the EPA on August 22, 2016 (81 FR 56508). This provision was omitted in error from the Federal Register publication, and this section therefore does not appear in the EPA approved Virginia SIP. With this submittal, VADEQ requests that the EPA correct the omission and incorporate 9VAC5-80-1255 into the Virginia SIP. Additionally, in this revision, VADEQ is requesting to add section 9VAC5-80-1773 (as amended by Revision D22) to the Virginia SIP. The key changes in the sections related to "Action on permit application" in various Virginia permit programs (9VAC5-80-860, 9VAC5- 80-1160, 9VAC 5-80-1773, 9VAC5-80-2060) involve adding a subsection in each of these sections to detail VADEQ's procedures for issuing a permit or denying an application for a permit (i.e., adding subsection G in 9VAC5-80-860 and 9VAC5-80-2060, adding subsection H in 9VAC5-80- 1160 and 9VAC5-80-1773). Additionally, VADEQ revised subsection D in section 9VAC5-80-1773 and subsection C in section 9VAC5-80-2060 to transfer authority on respective permit program's permit decision from the board to VADEQ. The key changes in the sections related to "Public participation" requirements in different permit programs (9AVC5-80-1775 and 9VAC5-80- 2070) involve removing instructions in their respective subsections G on how to request the board to directly consider PSD and NNSR permit applications, consistent with the transfer of authority from the Board to VADEQ. In section 9VAC-80-1775, Virginia revised subsection H to transfer PSD permit authority from the board to VADEQ following process prescribed in 9VAC-80-1773D. In section 9VAC5-80-2070, Virginia revised subsection H to transfer NNSR permit authority from the board to VADEQ following process prescribed in 9VAC-80-2060C.

B. EPA Analysis

1

The minimum requirements for the EPA approval of State or Tribal implementation plans are codified at 40 CFR part 51 subpart I (40 CFR 51.160 through 51.166). Specifically, 40 CFR 51.160 provides requirements on legally enforceable procedures. The regulation at 40 CFR 51.161 requires opportunity for public participation, including public availability of information, 30-day comment period, and prominent advertisement. The regulation at 40 CFR 51.162 requires each State SIP to identify the State or local agency which will be responsible for meeting the requirements of this subpart in each area of the State. This submitted revision is directly related to these requirements, i.e., transferring permitting authority from the Board to the Department (VADEQ), and public participation requirements in Virginia permit programs. The revisions in ections 9VAC5-80-860 and 9VAC5-80-1160 are related to "Action on permit application" for State Operating Permit and Minor NSR Permit programs. The key changes in these sections involve adding a subsection in each of these sections to detail VADEQ's procedures for issuing a permit or denying an application for a permit. These revisions are consistent with 40 CFR 51.163 on administrative procedures. Section 9VAC5-80-1255 establishes general requirements and procedures for permit actions to combine permit terms and conditions. Approving the section into the Virginia SIP is consistent with 40 CFR 51.163 on administrative procedures. The revisions in sections 9VAC5-80-1773 and 9VAC-80-1775 are related to "Action on permit application" and "Public participation" requirements for PSD permit program, which applies in areas that are in attainment with (or unclassifiable) the NAAQS. The VADEQ is requesting to add section 9VAC5-80-1773 (Action on permit) which describes administrative procedures for the PSD permit program, including timing, review process, and decisions on permit applications. Approving section 9VAC5-80-1773 into the Virginia SIP is consistent with 40 CFR 51.160 through 51.166. Revisions in section 9VAC-80-1775 (Public

2

participation requirements) are consistent with 40 CFR 51.161. The revisions in sections 9VAC5-80-2060 and 9VAC5-80-2070 are related to "Action on permit application" and "Public participation" requirements for the NNSR permit program, which is applicable in areas that are not in attainment with the NAAQS. The key changes in section 9VAC5-80-2060 involve adding a subsection to detail VADEQ's procedures for issuing a permit or denying an application for a permit. This revision is consistent with 40 CFR 51.163 on administrative procedures. Revisions in section 9VAC-80-2070 (Public participation requirements) are consistent with 40 CFR 51.161. The revisions in all these sections relating to the permit application decision process meet Federal requirements in 40 CFR 51.160 through 51.166. It also meets requirements in CAA section 173 on air permits for nonattainment areas. Under CAA section 110(l) provides that a revision to an implementation plan submitted by a State under this chapter shall be adopted by such State after reasonable notice and public hearing. The VADEQ SIP submission provided documentation of public participation record of the Virginia rulemaking. The VADEQ SIP submission met the public notice and public hearing requirements. The EPA finds the revisions to 9VAC5-80 sections 860, 1040, 1160, 1255, 1773, 1775, 2060, and 2070 are consistent with CAA section 110(l). None of the revisions interfere with any applicable requirement concerning attainment of any NAAQS nor interfere with reasonable further progress or any other applicable requirement of the CAA. In conclusion, the revised provisions submitted by VADEQ in 9VAC5 Chapter 10, Chapter 80, Chapter 85 and Chapter 170 meet the Federal requirements of 40 CFR 51.160 through 51.166, CAA sections 110(a)(2)(C) and 173, as well as 110 (l).